TRACT 29476 David Lane TRACT 29476 David Lane Wildomar, California 92595 United States
TRACT 29476 David Lane Wildomar, California 92595 United States
$1,650,000
- 19.83 Acres
- Exterior
- Land
- Property type
- NDP2101928
- Web Id
- NDP2101928
- MLS ID
- 4
- days ago
About TRACT 29476 David Lane
APPROVED 28 LOT FINAL MAP. SHOVEL READY. FULLY ENTITLED. SUBDIVISION, LIEN, & COA AGREEMENT WITH CITY. 95% ENGINEERED PLANS. GO TO: https://calprop.com/real-estate for all maps, subdivision agreement, COA, and other other downloadable documents. Project Notes, Tract 29476 in the City of Wildomar Project Name: Alta Colina, LLC Permits/Reports: California Water Boards, Stormwater WDID/App ID: 9-33C371295 45043, ACTIVE NPDES, WQMP, Army Corp, 401, 404, and MSHCP permits are ACTIVE. A burrowing owl study which is only valid for 30 days has to be re-submitted to City before grading. This process is inexpensive and the City will process immediately. 11 acres are not buildable and will be owned/managed by the RCA (Lots 29 and 30 are the RCA lots in the plans). A soils report has already been submitted and approved. Significant DG material, a huge plus! All entitlements and biologicals are completed (except burrowing owl). Plans: We strongly recommend that the builder retains Osment Grading. Recent bid available. Grading can begin immediately after a final retaining wall plan is submitted and the grading bond is posted (grading permit is paid), but another builder may want to submit their own wall design. The Verdura retaining wall system in our estimates will be the most cost effective solution (we reviewed 3 systems). This will require a structural engineer to prepare a plan and calculations, and the city will approve within 2-3 weeks per the Engineering Department, or Kameron Saber, who is the Senior City Engineer. Water and sewer plans were approved, but they did recently expire. A new will serve letter was just completed by EVMWD. Our engineers advised us that the plans can be quickly plan checked again for approximately $4,000.00 with the Elsinore Valley Water District (engineer cost). This is can be done within 2 weeks per our civil and City Engineer. The current plans do not require any changes. Water and sewer main lines, and all other utiliti...
Listing Courtesy of Calprop Group, Inc, Savannah MLS
Listing Courtesy of Calprop Group, Inc, Savannah MLS
PROPERTY INFORMATION
- Community Info
- Biking, Foothills, Hiking, Mountainous
- View
- Mountain(s), Panoramic, Valley
- Water
- Public
EXTERIOR
- Lot Description
- 2-5 Units/Acre, Cul-De-Sac, Rolling Slope
Listing Courtesy of Calprop Group, Inc